Quality Remerton GA septic system installers do a number of examination, long before a unit gets placed into the ground. A new unit will last decades, and possibly even generations, if it’s set up correctly, but it can break down right away if it’s not. On top of that, all Remerton GA septic system installers must obtain a permit in order to do the install, and may have to partner with city or county officials to show that specific tests were run in order to proceed. These three tests are essential initial steps that should always be taken before any work or designs are done, and it may also be beneficial to perform them before you purchase a property, so you can be assured that a tank and leach field will be allowed.
1. Pit
The pit test is very straightforward. During the course of this test, a hole is excavated and the soil is examined to figure out its structure. A conventional leach field is dependent on the soil’s composition to drain successfully. If there is a lot of gravel or sand, your leach field should be capable to discharge the effluent (water) from the tank well, where the soil will finish sanitizing it. If the soil has a bunch of clay or rock, it won’t sink well, and so a conventional leach field will not be an alternative. If the location you’ve chosen does not pass the pit test, you may be able to choose another site on your home or use an alternate kind of drain field, like a mound system.
2. Perc
The perc, or percolation test, involves digging a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then filling it with water. The hole is normally left drenched for about two hours, and refilled as needed. Then, the hole is filled with 6 inches of water and observed for water drainage.
3. Visual
There are several things an inspector will look into visually. A lot of units are gravity-fed, so they don’t depend on electricity or pumps to shift effluent from the tank to the leach field. As a result of this, the slope of the ground is important. An inspector will also search for slopes that can feed excess water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.
Work with Quality Remerton GA Septic System Installers Now
Picking the right configuration, kind of system, and assessing the land properly, are all integral steps in making sure an install goes off without a hitch. Most significantly, these steps ensure that the install is done properly, so that a system provides decades of use without problems. If you’re preparing for an install, contact Septic Tank Pros Valdosta GA. Our partner service technicians are experienced and devoted to quality, so you could be sure the job is done right. Call (229) 415-7780 right now.